FOR

Framework Operating Requirements - Consultation Draft June 2019

 

The attached document is the current draft version 2.0 available for the ECO consultation commencing 9th July 2019.

The Framework Operating Requirements have been written in preparation should TrustMark (2005) Limited be written in to the ECO Regulations following the consultation.

All feedback should be provided through the ECO consultation process.

The closing date for the consultation is 6th August 2019.